How do I change display periods in the Cost Analyzer V2?

To change the display periods in the Cost Analyzer, use the From and To fields within the Periods group on the ribbon. This lesson covers using the Periods group fields in the Cost Analyzer.

View the Current Periods Displayed

  • View the current periods (months) displayed in both the top and bottom grids.

Change the Display Periods

  1. Click in the To Period field.
  2. Select the desired month.

View the Selected Displayed Periods

  • View the selected displayed periods.