How do I change the display periods in the Cost Planner?

This lesson covers changing the display periods in the Cost Planner.

View the Periods Displayed

  • The Periods Group on the ribbon is used to change the time periods displayed in the Cost Planner. View the current periods displayed.

Select the From Period

  1. Click the "From Period" drop down menu.
  2. Select the desired "From Period" from the menu options.

Select the To Period

  1. Click the "To Period" drop down menu.
  2. Select the "To Period" from the menu options.

View the Selected Time Periods

  • View the selected time periods.